If you’re living under a roof where privacy is a privilege, you might be thinking about how you can section off the rooms of your home to make them more intimate. Building a non-bearing interior wall can add an element of separation and independence to even the most open of spaces. This project requires basic carpentry skills, as well as tools to go along with them.
Building an interior wall will greatly depend on the existing structure, including the floors, walls, and ceiling. You may have to make a few minor adjustments to accommodate the new structure, but have no fear! If you’re interested in creating a new wall for whatever reason, read on to find our step by step guide for this project.
Here's how to build an interior wall!
1- Measure and mark

source: Pixabay, jin3068
First off, determine where you want the wall to go, looking at the existing structure. You’ll need to remove anything obstructing where your new wall will be placed, including plasterboard, as this will allow you to see ceiling joists and wall studs. If these are not visible, you will require a stud finder to locate the studs and joists.
Once this has been completed, mark the centre line of the new wall you are going to build, using chalk to draw a line across the ceiling. Next, you must measure half the width of the wall and mark this in either direction. Plan to insert a stud at each end to hold the wall in place.
Following this, measure the placement of each wall stud onto the wall plates, laying both top and bottom plates side-by-side on the floor. Make sure to measure as carefully as possible, marking perpendicular lines across the plates. Use a combination square so that the studs will align correctly.
2- Insert the ceiling plate
Make sure that before you begin working with tools that you wear protective eyewear, as well as ear protection if you’re working with loud machinery. Be certain to ask for help lifting items if necessary. If the joists have not yet been located in the ceiling, now is the time to do so. If your new wall is going to be perpendicular to the ceiling joists, plan to attach the wall where the joists intersect.
However, if the wall is parallel, you have more than one choice. One option is to locate your new wall directly underneath one of the joists, and the other is to install nailing blocks every 16-inches between the placement of the joists. These blocks will act as a border for your new wall to be nailed directly into.
Once you’ve decided on your method of operation, hold the top ceiling plate in position along the guideline that you’ve marked. Once in place, nail through and into the ceiling, or the nailing blocks if you’ve chosen this style. Use 3 ½ inch nails, and work to fasten the plate neatly in place.
3- Plumb bob and insert studs

source: Flickr
Now that the ceiling plate has been inserted, hang a plumb bob from either end of the plate. A plumb bob is a string with a weight resting at the end. Following this, mark the floor directly below the bobs to know where the bottom plate will be located. Use chalk to draw a line along the floor between the marks. Now, nail the floor plate in place, staggering nails in the same fashion as the ceiling.
Next, measure the height of the room, and subtract the combined thickness of the two plates. This will help you to determine the length of your studs. Now, if studs have not been precut, cut and place the studs between the top and bottom plates, attaching them with nails or screws. You can do this by lifting the stud into position and lining it up on its mark, making sure it is flush with the edges of both plates. You can check the plumb using a carpenter’s level.
4- Form connections and insert the wall
Now, it’s time to lift the new wall into place. Line it up directly with the chalk line you made across the floor, but also make sure to line it up with the line on the ceiling. Again, use the level to make sure the wall is vertical. If gaps exist between the wall and ceiling, shim them. Nail or screw the wall into place in the ceiling joists. Further, if there is a wall on either side of the new wall, secure it in place there as well.
Steps to follow | What you need to do |
1) Measure and mark |
|
2) Insert the ceiling plate |
|
3) Use the plumb wire and place the studs |
|
4) Form contacts and insert the wall |
|
Here's some articles that might be interresting:
Get 3 renovation quotes for your interior wall project
RenoQuotes.com can help you get quotes for your interior wall project. If you submit your project to us, we’ll put you in contact with top-rated contractors. Fill in the form on the homepage (it only takes a few minutes), and you will get estimates from trusted professionals.
Dial 1-844 828-1588 to speak with one of our customer service representatives
Looking for something else?
Related articles
The latest industry news, interviews, technologies, and resources.

Editorial Team
•10 Feb 2026
At the start of each year, the annual home maintenance checklist comes out. It’s part of being a homeowner. It helps keep the house in good condition and identify if any work will need to be done in the coming months.

Editorial Team
•05 Aug 2024
Polymeric sand is key to laying pavers since said jointing material efficiently fills the gaps between each and every stone. It provides heightened protection against erosions while preventing weed growth and insect infestations. Retailed in a wide array of colours, it gives your landscaping that perfect aesthetic touch.

Editorial Team
•19 May 2026
Carpentry is a cornerstone trade in Ontario’s construction industry, offering diverse career opportunities across residential, commercial, and industrial sectors. Carpenters play an essential role in constructing, renovating, and maintaining structures, making this a rewarding and in-demand career path. This article provides a detailed guide on how to become a carpenter in Ontario, covering educational pathways, certification requirements, and the vibrant job market.

Editorial Team
•27 Aug 2025
Did you know that concrete could be recycled? Well, yes siree Bob! Concrete recycling is a technique used to salvage concrete waste. It’s an alternative to disposing of it in landfills that happens to be both cost-effective and eco-friendly. So, let’s zero in on concrete recycling, a practice that’s still, to this day, little known in Canada.

Amanda Harvey
•31 Mar 2025
Unanticipated noises in the wrong place at the wrong time can be jarring, stressful, and annoying. The best way to deal with it is soundproofing at the source.